Backflow Testing & Filing: City-by-City Checklist
What inspectors expect, who can file, where to upload proofs—built for multi-location operators.
All proofs in one packet
What inspectors expect, who can file, where to upload proofs—built for multi-location operators.
Annual testing, filings, and receipts—what inspectors expect, who can file, and where the proofs live. Built for multi‑location operators.
Last checked: September 1, 2025
Annual test by a certified tester. Most jurisdictions require a yearly test by a licensed/certified Backflow Prevention Assembly Tester (BPAT/CCCDI/etc.). Save the completed test report.
Filing/receipt with the utility. Many cities require submittal of the passing test to the water utility (portal upload or email). Save the receipt or confirmation number.
Device ↔ location mapping. The device ID/make/serial at each address must match your roster and due dates.
Store proofs where Ops can find them. Attach to your FM system work order and include in your monthly OnePacket for an audit‑ready record.
Rules vary by city. Use the list below to start and verify linked pages for the most current details.
Map every device. Keep one sheet listing address, device ID (make/model/serial), last test, next due, and the responsible vendor.
Book early & confirm access. Send day‑before and morning‑of confirmations to reduce no‑access/re‑books.
Collect two proofs. (a) Test report (pass), and (b) filing proof (utility receipt or portal confirmation ID).
Name & file consistently. Example: Brand–City–Store#–DeviceID–YYYY‑MM‑DD.pdf. Attach to your FM work order and central folder.
Track exceptions until closed. If a receipt is pending, label it “submitted—receipt pending” and follow up weekly until posted.
One monthly packet for the portfolio. Keep a single PDF that aggregates all locations for the month. Recommended naming: Monthly-Compliance-Packet_[Brand]_[YYYY-MM].pdf.
Underlying artifacts (if you also attach to work orders). Save each report/receipt as its own file so auditors can trace a device back to a store. Recommended naming: [Brand]_[City]_[Store#]_[Category]_[DeviceID]_[YYYY-MM-DD].pdf. If you don’t maintain individual files, skip this and rely on the monthly packet.
Foldering. Year → Month → Packet + artifacts. Example: Compliance/2025/09/.
FM systems (optional). If you use a facilities platform (ServiceChannel, Corrigo, Ecotrak), attach each artifact to the relevant work order and still retain the monthly packet for the portfolio view.
Where to file / portal: Austin Water WEIRS & BPAT resources (city pages).
Who can test: State‑licensed BPAT registered with City of Austin.
Testing cadence (typical): Annual (device/usage dependent).
Proof to save: Test report + any City record/receipt/WEIRS confirmation.
Where to file / portal: BWSC cross‑connection regulations & annual inspection rules.
Testing cadence (typical): Annual for double‑check; others per hazard.
Proof to save: Test/inspection report + BWSC approval/record.
Where to file / portal: City CCCDI program portal.
Who can test: Licensed CCCDI with licensed/bonded plumbing contractor.
Testing cadence (typical): Annual.
Proof to save: CCCDI test report + City acceptance.
Where to file / portal: DWU SwiftComply online test uploads.
Program Overview: Backflow Prevention Requirements (PDF)
Who can test: Certified testers registered with Dallas + in SwiftComply.
Testing cadence (typical): Annual.
Proof to save: Portal submission receipt + test report.
Where to file / portal: Denver Water Cross‑Connection Control Office (see program pages).
Who can test: Certified backflow technicians per state/Denver Water.
Testing cadence (typical): Annual.
Proof to save: Test report + email/portal confirmation.
Where to file / portal: Cross‑Connection Control Program.
Who can test: Certified backflow tester recognized by City/State.
Testing cadence (typical): Annual.
Proof to save: Test report + utility email/receipt.
Where to file / portal: LADWP Backflow Prevention requirements.
Who can test: LADWP‑approved/certified testers.
Testing cadence (typical): Annual.
Proof to save: Test report + any LADWP confirmations.
Where to file / portal: LA County Public Health tester program; LACWD acceptance.
Who can test: County‑certified tester (Public Health).
Testing cadence (typical): Annual.
Proof to save: Test form + county acceptance.
Where to file / portal: MDWASD tester online reporting/how‑to; portal instructions (PDF).
Who can test: County‑certified testers per Miami‑Dade Code.
Testing cadence (typical): Annual.
Proof to save: Web submission confirmation + test report.
Where to file / portal: NYC DEP Cross‑Connection Control (handbook, device approval, testing).
Who can test: NY‑approved testers per DEP/NY State rules.
Testing cadence (typical): Annual (and as required by DEP).
Proof to save: Test report + DEP approval/record.
Where to file / portal: PWD backflow program; regulations; USC assemblies list.
Who can test: Certified technicians; assemblies on USC list.
Testing cadence (typical): Annual.
Proof to save: Test report + PWD filing/acceptance.
Where to file / portal: City of Phoenix backflow prevention program.
Who can test: Arizona‑licensed testers per AAC and City.
Testing cadence (typical): Annual.
Proof to save: Test report + City record.
Where to file / portal: SAWS backflow program & annual testing pages.
Who can test: Certified testers per SAWS/City code.
Testing cadence (typical): Annual.
Proof to save: Test report + SAWS record.
Where to file / portal: Cross‑Connection Control; test request form (PDF); approved testers.
Who can test: City‑approved testers.
Testing cadence (typical): Annual.
Proof to save: Test form + City confirmation.
Where to file / portal: SFPUC Cross‑Connection Control; consumer guide; Health Code.
Who can test: Approved testers per SFPUC/Health Code.
Testing cadence (typical): Annual (per hazard).
Proof to save: Test report + SFPUC acknowledgment.
Where to file / portal: SPU; requirements/devices; testing pages.
Who can test: Approved testers per SPU/state rules.
Testing cadence (typical): Annual.
Proof to save: Test report + SPU submission.
Where to file / portal: DC Water Compliance Program—Cross‑Connection Control.
Who can test: Approved testers per DC Water manual.
Testing cadence (typical): Annual.
Proof to save: Test report + DC Water record.
✅ Passing test report (correct device info, date, tester credentials).
✅ Filing proof (utility receipt, email acknowledgment, or portal confirmation ID).
✅ Device/store mapping matches your roster and cadence.
✅ Stored in your FM system and in your monthly OnePacket.
⏳ If a receipt isn’t posted yet: mark submitted—receipt pending and re‑check weekly.
Do we have to change testers?
No. You keep your vendors. We coordinate scheduling and collect required artifacts.
What if a vendor doesn’t respond?
We escalate (vendor → your contact → store), log it in Exceptions, and re‑book. Chronic misses are flagged; we’ll suggest alternates only if you ask.
Who’s responsible for the test work?
The licensed tester. We coordinate and assemble proofs; they perform and sign the test.
How do you reduce no‑access?
Day‑before and morning‑of confirmations (EN/ES), plus vendor reminders. We target ≤ 10% no‑access/reschedules.
Get your 30-day calendar in 24 hours.